Pond Pier Build

Looking To Do Repairs To Your Dock Or Seawall on Lake Tillery or Badin Lake? Getting the proper Duke Energy or CUBE permitting can sometimes be a challenge for some so let our office take that weight off of your shoulders! Don't hesitate to reach out and let us know how we can be of help!

​S.H. Terry Construction, Inc.

Woodrun Lake Tillery Remodel


  • Division 2          Grading/ Land Development
  • Division 3          Concrete/ Stamped Concrete
  • ​Division 5          Handrails, decorative and cable/ Steel Fabrication& Installation
  • Division 6          Framing and drying in new additions
  • Division 7          Roofing both metal and shingle
  • Division 8          Door and Hardware/ Bathroom Accessories and Partitions
  • Division 15        Mechanical/ HVAC/ Plumbing
  • Division 16        Electrical

​Board for Board Replacement